NTSB PRESS RELEASE

Similar Posts

  • |

    Press Release – FAA Announces Over $2.5 Million in Additional Recovery Act Airport Grants

    For Immediate Release
    September 28, 2010

    WASHINGTON – The U.S. Department of Transportation’s Federal Aviation Administration (FAA) today announced that three additional airport projects have been selected for funding, paid for with more than $2.5 million in American Recovery and Reinvestment Act dollars that became available because of airport projects that came in under budget nationwide.

    “With these additional Recovery Act dollars, we can provide a bigger boost to economic growth while we modernize more of our nation’s airports,” said U.S. Transportation Secretary Ray LaHood.

    Earlier this month, the FAA announced that five other airport projects would receive $9 million in Recovery Act funding that became available thanks to low bids and under-budget airport projects.

    “We are thrilled that we have been able to stretch Recovery Act dollars to meet the needs of more airports. These projects will improve airport operations and help our airspace system to run more efficiently,” said FAA Administrator Randy Babbitt.

    The three additional rehabilitation projects are:

    • Lawrence, Mass., Municipal Airport
      An ARRA grant for $1.2 million will fund several pavement rehabilitation projects on airport taxiways and aircraft parking aprons.
    • Hartsfield-JacksonAtlanta International Airport
      This $1 million ARRA grant will fund the ongoing construction and paving of the new international terminal apron.
    • CharlesM. Schulz-Sonoma County Airport, Santa Rosa, Calif.
      A $379,000 ARRA grant will allow the airport to complete the second phase of its terminal rehabilitation and replace the terminal building roof.

    Under the Recovery Act, more than $1.3 billion has been made available nationwide for both airport improvement projects and air traffic control facility and system upgrades. Because of low construction bids for projects, more Recovery Act dollars were available for additional facilities, equipment and airport projects. These grants have been distributed to airports that serve commercial passengers, cargo and general aviation.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • |

    Alagro Fumigaciones Named Authorized Service Center for GE’s M601 and H80 Engines

    –EVENDALE, OHIO– Alagro Fumigaciones has signed an agreement with GE Aviation to become an Authorized Service Center for the M601 and H80 turboprop engines.

    As part of the agreement, Alagro Fumigaciones will offer comprehensive line maintenance, removals and re-installations of engines and LRUs and engine spares for the M601 and H80 engine families. GE Aviation will provide Alagro with comprehensive material support and training.

    “Alagro Fumigaciones is a well-known service provider in South America with more than 40 years of experience in the marketplace,” said Paul Theofan, president and managing executive of GE Aviation’s Business and General Aviation Turboprops. “With Alagro as an authorized service center, GE Aviation can better support its M601 and future H80 operators in the region.”

    Alagro Fumigaciones, located in Funes, Argentina, specializes in maintenance and repair of aircraft. Alagro provides engine inspections, airworthiness extensions, airworthiness approvals in Argentina, and a variety of repairs for aircraft and airframes. In addition to working with more than 90 customers across Argentina, Alagro also collaborates on repairs and production with Ecuador, Uruguay and Brazil.

    In 2009, Premier Turbines was selected as a Designated Repair Center in South and North Americas for GE’s M601 and, once in service, the H80 turboprop engines. As a Designated Repair Center, Premier Turbines offers heavy repair services, full test capabilities, exchange engines and rentals, line replacement unit rotable pools and field service support to all existing and future M601 and H80 engines in the Americas region. GE Aviation provides the necessary OEM parts to meet Premier Turbines’ needs.

    GE Aviation’s Business & General Aviation Turboprops has more than 1,600 M601 engines in service that have accumulated more than 17 million flight hours on 30 applications. Flight testing on the H80 engine continues on the Thrush 510G aircraft. The H80 is undergoing certification testing and will power business and general aviation, utility and agriculture aircraft. The H80 engine combines the elegant, robust design of the M601 engine with GE’s 3-D aerodynamic design techniques and advanced materials to create a more powerful, fuel-efficient, durable engine compared with the M601 engine, with no recurrent fuel nozzle inspections and no hot section inspection. The H80 engine will also feature an extended service life of 3,600 flight-hours or 6,600 cycles between overhauls, significantly enhanced hot-day takeoff performance and high-altitude cruise speeds. The H80 will provide the option of a single- or dual-acting governor, allowing customers flexibility in propeller selection.

    GE Aviation, an operating unit of GE (NYSE: GE), is a world-leading provider of jet and turboprop engines, components and integrated systems for commercial, military, business and general aviation aircraft. GE Aviation has a global service network to support these offerings. For more information, visit us at www.ge.com/aviation. Learn more about GE Business & General Aviation at http://facebook.com/GEBGA. Follow GE Aviation on Twitter at http://twitter.com/GEAviation and YouTube at http://www.youtube.com/user/GEAviation.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • |

    NTSB SENDING TEAM TO ASSIST IRELAND IN METROLINER INVESTIGATION

    NTSB Advisory
    National Transportation Safety Board
    Washington, DC 20594
    February 10, 2011

    NTSB SENDING TEAM TO ASSIST IRELAND IN METROLINER INVESTIGATION

    The National Transportation Safety Board is sending three investigators to assist the Government of Ireland as it investigates the crash of an airliner this morning.

    At about 9:45 a.m. local time today, a Swearingen SA-227 Metroliner (Spanish registration EC-ITP), operated by Flightline/Manx2 Air as flight 7100 from Belfast, Northern Ireland, crashed after attempting a landing at Cork Airport, Cork, Ireland. Twelve people were aboard the aircraft, and there are reports of both fatalities and survivors.

    NTSB senior air safety investigator Dan Bower has been designated the U.S. Accredited Representative and is being assisted by an NTSB systems investigator and an NTSB operations investigator. A Federal Aviation Administration investigator is also joining the team.

    Information about the progress of the investigation will be released by the Air Accident Investigation Unit of Ireland, +353 (0) 1-604-1293.

    ###

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • NTSB DETERMINES CAUSE OF EMS HELCOPTER MIDAIR COLLISION IN ARIZONA

    May 8, 2009 -NTSB Advisory The National Transportation Safety Board has determined that the probable cause of a midair collision between two emergency medical service (EMS) helicopters last year was that both pilots’ failed to see and avoid the other helicopter on approach to the helipad. Read More

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | |

    Vietnam Airlines and Boeing Team to Enhance 777 Passenger Experience

    SEATTLE, Aug. 26 /PRNewswire-FirstCall/ — Boeing (NYSE: BA) and Vietnam Airlines have teamed on a key initiative to upgrade the level of comfort for Vietnam Airlines’ passengers, unveiling the carrier’s latest cabin interior modernization on four of the airline’s 777-200ERs. Vietnam Airlines will improve its passenger service with an increased focus on the overall passenger experience and comfort while continuing to expand the network and add new destinations.

    In support of Vietnam Airlines’ goals, Boeing Commercial Aviation Services developed a cabin layout that meets the discerning needs of the airline and its passengers, and also provided the engineering services and program integration as well as managing the worldwide group of suppliers that Vietnam Airlines selected for the program.

    Boeing produced the U.S. Federal Aviation Administration-certified service bulletin and kit of parts to accommodate the relocation of business class seats; installation of new deluxe economy and economy class passenger seats; and revisions to the in-flight entertainment system, in-seat power and cabin cooling systems. Boeing also relocated and updated lavatories, galleys, ceilings, sidewalls, lighting, plumbing and the lower lobe attendant crew rest modules to enable the expanded service planned for these 777s.

    The first aircraft was recently completed and Vietnam Airlines has proudly re-introduced the aircraft into service.

    “We are very pleased to have selected Boeing to be our partner in developing and delivering this interior upgrade program,” Vietnam Airlines Executive Vice President of Technical Nguyen Van Hung said. “Our interior modernization program is a key part of our efforts to provide market leading services and passenger comfort, further affirming Vietnam Airlines’ position as a major carrier in the Southeast Asian region, especially after we joined the SkyTeam alliance.”

    “As the original designer and builder of the 777, Boeing is proud to be selected by Vietnam Airlines for this important interior upgrade program. Boeing is uniquely positioned with experience and expertise to engineer, certify and manage modification programs for our customers,” said Dennis Floyd, vice president, Fleet Services for Boeing Commercial Airplanes. “This interior upgrade will support Vietnam Airlines’ aggressive plan to continue to compete among the world’s leading carriers.”

    As a full-service integrator, Boeing can perform as much of an airline interior upgrade as required, including management of all aspects of the project through certification.

    About Vietnam Airlines
    As the national flag carrier of Vietnam, headquartered in Hanoi, Vietnam Airlines flies 75 routes to 20 domestic and 26 international destinations with more than 290 daily flights. Operating the young fleet of 70 modern aircraft, the airline expects to further expand its fleet to 115 and 165 aircraft by 2015 and 2020, respectively. www.vietnamairlines.com.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • |

    Updated Boeing Statement on 787 Dreamliner ZA002 Incident

    EVERETT, Wash., Nov. 11, 2010 Boeing continues to investigate Monday’s incident on ZA002. We have determined that a failure in the P100 panel led to a fire involving an insulation blanket. The insulation self-extinguished once the fault in the P100 panel cleared. The P100 panel on ZA002 has been removed and a replacement unit is being shipped to Laredo. The insulation material near the unit also has been removed.

    Damage to the ZA002 P100 panel is significant. Initial inspections, however, do not show extensive damage to the surrounding structure or other systems. We have not completed our inspections of that area of the airplane.

    The P100 panel is one of several power panels in the aft electronics bay. It receives power from the left engine and distributes it to an array of systems. In the event of a failure of the P100 panel, backup power sources – including power from the right engine, the Ram Air Turbine, the auxiliary power unit or the battery – are designed to automatically engage to ensure that those systems needed for continued safe operation of the airplane are powered.

    The backup systems engaged during the incident and the crew retained positive control of the airplane at all times and had the information it needed to perform a safe landing.

    Molten metal has been observed near the P100 panel, which is not unexpected in the presence of high heat. The presence of this material does not reveal anything meaningful to the investigation.

    Inspection of the surrounding area will take several days and is ongoing. It is too early to determine if there is significant damage to any structure or adjacent systems.

    As part of our investigation, we will conduct a detailed inspection of the panel and insulation material to determine if they enhance our understanding of the incident.

    We continue to evaluate data to understand this incident. At the same time, we are working through a repair plan. In addition, we are determining the appropriate steps required to return the rest of the flight test fleet to flying status.

    Boeing will continue to provide updates as new understanding is gained.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.