| | | | |

New Lion Air Boeing Carcass Cut in Two for Removal

Similar Posts

  • | | | | | |

    Yakutia Boeing Skids off slick Runway

    What: Yakutia Boeing 737-86-N en route from Rimini Italy to Rostov Russia
    Where: Rostov Airport
    When: Dec 1, 2012
    Who: 120 aboard
    Why: The Yakutia flight was landing at Rostov Airport and skid off the runway when the pilot applied brakes.

    Passengers disembarked safely with no injuries.

    It took half an hour to tow the plane the ten yards back to the runway with a 20 ton truck.

    No injuries were reported. Passengers exited the plane via “ladder.” (Possibly a mistranslation!) The plane stopped on soft ground off the runway while it was raining.

    Video

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | | | |

    Chinese Cargo Flight Runway Excursion in Taiwan

    China Airlines Cargo Boeing 747-409F was en route from Abu Dhabi to Taipei when it suffered runway excursion on landing. The right landing gear went off the runway on landing, damaging runway lights, a taxi light and tires. The gear left a track of 570 feet

    The airport advance team measured, tested the aircraft, performed preliminary interviews with the pilot, removed the CVR FDR and collected data. The preliminary report is being developed according to http://www.asc.gov.tw/asc_ch/news_list_2.asp?news_no=530

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | | | | | |

    American Airlines Plane Returns to Miami

    American EagleAmerican Airlines flight AA-56 had to return and make an emergency landing in Miami, Florida, on September 2nd.

    The Boeing 777-200 plane took off for Heathrow Airport, London, United Kingdom, but had to return shortly afterwards due to an unusual smell onboard.

    The plane landed uneventfully. Everyone aboard remained safe.

    The airline arranged a replacement plane for the passengers.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | | | |

    Flybondi Plane makes Tail Strike in Argentina

    Flybondi flight FO-5450 made a hard landing on Cataratas del Iguazú International Airport, Argentina, on July 15th.

    The Boeing 737-800 flying from Las Heras, Argentina, had a tail strike while landing on the runway.

    The plane sustained minor damage.

    No injuries were reported.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | | | | |

    Hawaiian Airlines Plane Diverts to Japan due to Issue in Hydraulic System

    Hawaiian AirlinesHawaiian Airlines flight HA-442 had to divert and make an emergency landing at Narita International Airport, Narita, Tokyo, Japan, on July 28th.

    The Boeing 767 en-route to Honolulu, Hawaii, from Sapporo, Japan, was mid-air when the crew detected some issue with its hydraulic system.

    The plane landed uneventfully.

    All 248 passengers and crew members onboard remained unharmed.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | |

    Dreamliner Battery Box Solution

    An upgrade to the battery has been reported, and Boeing is adding a fire-resistant battery box to contain the cells, and insulation around that. The box is to vent smoke outside, and will be made of titanium.

    Boeing is still planning on using lithium-ion cells instead of switching to nickel cadmium. The batteries face a series of twenty lab tests before test flights will be permitted.

    The two approved test flights include one for the new battery, and one for the new box.

    Each Dreamliner has one lithium-ion battery to power cockpit systems, and one to power on-ground functions that used to be hydraulic.

    The FAA statement is below:
    WASHINGTON, D.C. – The Federal Aviation Administration (FAA) today approved the Boeing Commercial Airplane Company’s certification plan for the redesigned 787 battery system, after thoroughly reviewing Boeing’s proposed modifications and the company’s plan to demonstrate that the system will meet FAA requirements. The certification plan is the first step in the process to evaluate the 787’s return to flight and requires Boeing to conduct extensive testing and analysis to demonstrate compliance with the applicable safety regulations and special conditions.

    “This comprehensive series of tests will show us whether the proposed battery improvements will work as designed,” said Transportation Secretary Ray LaHood. “We won’t allow the plane to return to service unless we’re satisfied that the new design ensures the safety of the aircraft and its passengers.”

    The battery system improvements include a redesign of the internal battery components to minimize initiation of a short circuit within the battery, better insulation of the cells and the addition of a new containment and venting system.

    “We are confident the plan we approved today includes all the right elements to conduct a comprehensive evaluation of the battery system redesign,” said FAA Administrator Michael P. Huerta. “Today’s announcement starts a testing process which will demonstrate whether the proposed fix will work as designed.”

    The certification plan requires a series of tests which must be passed before the 787 could return to service. The plan establishes specific pass/fail criteria, defines the parameters that should be measured, prescribes the test methodology and specifies the test setup and design. FAA engineers will be present for the testing and will be closely involved in all aspects of the process.

    The FAA also has approved limited test flights for two aircraft. These aircraft will have the prototype versions of the new containment system installed. The purpose of the flight tests will be to validate the aircraft instrumentation for the battery and battery enclosure testing in addition to product improvements for other systems.

    The FAA will approve the redesign only if the company successfully completes all required tests and analysis to demonstrate the new design complies with FAA requirements. The FAA’s January 16, 2013 airworthiness directive, which required operators to temporarily cease 787 operations, is still in effect, and the FAA is continuing its comprehensive review of the 787 design, production and manufacturing process.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.