Boeing

  • | | | |

    LAX: AA Routine Emergency Landing


    Pictured: An American Airlines Boeing 757-223 at Dallas / Fort Worth – International
    Click to view full size photo at Airliners.net
    Contact photographer Tim Perkins

    What: American Airlines Boeing 757-200 en route from Los Angeles,CA to Dallas Ft. Worth,TX
    Where: Los Angeles
    When: Dec 18th 2009
    Who: 193 passengers
    Why: On takeoff, the right main gear door was stuck open, and the landing gear would not retract. The plain turned around and landed safely at LAX. Passengers debarked and were provided an alternative flight.

  • | | | | | |

    Qantas Engine Shut Down; Safe Singapore Landing


    Click to view full size photo at Airliners.net
    Contact photographer Wim Callaert

    What: Qantas Boeing 747-400 en route from Singapore to Melbourne
    Where: Singapore
    When: Dec 17th 2009
    Who: 354 passengers and 19 crew
    Why: While en route, the outer right engine surged. Passengers reported bangs and vibration, and flames.

    The crew shut down the engine and returned to Singapore on the remaining 3 engines, where they made a safe landing.

    The flight was delayed for a day. It is not reported if this plane completed the route or if an alternative plane was used.

  • | | | | |

    Plane Struck on Runway


    Click to view full size photo at Airliners.net
    Contact photographer Max Bryansky

    What: Air India Boeing 747-437 to Copenhagen
    Where: Indira Gandhi International Airport
    When: Dec 17, 2009 2:30 pm
    Who: Prime Minister
    Why: While on the tarmac, the Boeing 747 “Agra” was struck by a food delivery vehicle.

    The plane involved in the incident was the Indian Prime Minister’s plane. Subsequent to the incident, the Prime Minister departed from Delhi on an alternate plane.

  • | | |

    First Air Altitude/Speed At Odds


    Click to view full size photo at Airliners.net
    Contact photographer Peter Tsagaris

    What: First Air Boeing 767-200 en route from Ottawa to Iqaluit
    Where: Iqaluit
    When: Dec 12th 2009
    Who: 4 crew
    Why: The runway was not clear (assuming this means weather /precipitation) and after takeoff, airspeed dropped as the plane climbed, and the plane nearly stalled. The flight continued to its destination. Flight data was analyzed after the fact, and it was concluded that airspeed had dropped, and that the safety management system needed adjustment

  • | | |

    Hydraulics: UA at Munich


    Click to view full size photo at Airliners.net
    Contact photographer Allan Martins Antunes

    What: United Airlines Boeing 777-200 en route from Washington Dulles to Munich
    Where: Munich
    When: Dec 16th
    Who: not available
    Why: After a normal flight, the UA flight burst a nose gear hydraulics line on touch down on arrival to Munich. The plane was towed to the gate, taken to maintenance and the return flight was cancelled.

  • | | | | |

    Transaero Go-round


    Click to view full size photo at Airliners.net
    Contact photographer Erezms

    What: Transaero Boeing 737-400 en route from Moscow to Tel Aviv
    Where: Tel Aviv
    When: Dec 15th 2009
    Who: 102 passengers and 7 crew
    Why: On approach to Tel Aviv, twice the plane received re-directs, and in both cases, the flight made a go-around. (The approaches were made to runways scheduled with departing traffic.)

    On the third approach, the plane landed safely.

  • | | | |

    Latvia: Air Baltic Boeing Emergency


    Click to view full size photo at Airliners.net
    Contact photographer Augustas Didzgalvis

    What: Air Baltic Boeing 737-500 en route from Riga to Berlin
    Where: Palanga Lithuania
    When: Dec 16th 2009
    Who: not available
    Why: While en route, the plane experienced generator failure. The crew declared emergency and returned to Riga where they made a safe landing.
    A replacement jet was flown in fewer than 4 hours later.

  • |

    PR: All-new Boeing Airplane Touches Down Safely After 3-Hour Mission

    In George’s opinion, Boeing is smart to add the heavy metal to the composite.


    SEATTLE, Dec. 15 /PRNewswire-FirstCall/ — The Boeing (NYSE: BA) 787 Dreamliner took to the sky for the first time today, ushering a new era in air travel as it departed before an estimated crowd of more than 12,000 employees and guests from Paine Field in Everett, Wash. The flight marks the beginning of a flight test program that will see six airplanes flying nearly around the clock and around the globe, with the airplane’s first delivery scheduled for fourth quarter 2010.

    The newest member of the Boeing family of commercial jetliners took off from Paine Field in Everett, Wash. at 10:27 a.m. local time. After approximately three hours, it landed at 1:33 p.m. at Seattle’s Boeing Field.

    787 Chief Pilot Mike Carriker and Capt. Randy Neville tested some of the airplane’s systems and structures, as on-board equipment recorded and transmitted real-time data to a flight-test team at Boeing Field.

    After takeoff from Everett, the airplane followed a route over the east end of the Strait of Juan de Fuca. Capts. Carriker and Neville took the airplane to an altitude of 15,000 feet (4,572 meters) and an air speed of 180 knots, or about 207 miles (333 kilometers) per hour, customary on a first flight.

    “Today is truly a proud and historic day for the global team who has worked tirelessly to design and build the 787 Dreamliner – the first all-new jet airplane of the 21st century,” said Scott Fancher, vice president and general manager of the 787 program. “We look forward to the upcoming flight test program and soon bringing groundbreaking levels of efficiency, technology and passenger comfort to airlines and the flying public.”

    Powered by two Rolls-Royce Trent 1000 engines, the first Boeing 787 will be joined in the flight test program in the coming weeks and months by five other 787s, including two that will be powered by General Electric GEnx engines.
    The 787 Dreamliner will offer passengers a better flying experience and provide airline operators greater efficiency to better serve the point-to-point routes and additional frequencies passengers prefer. The technologically-advanced 787 will use 20 percent less fuel than today’s airplanes of comparable size, provide airlines with up to 45 percent more cargo revenue capacity and present passengers with innovations that include a new interior environment with cleaner air, larger windows, more stowage space, improved lighting and other passenger-preferred conveniences.

    Fifty-five customers around the world have ordered 840 787s, making the 787 Dreamliner the fastest-selling new commercial jetliner in history.

    ###
    Contact:
    Yvonne Leach
    787 Communications
    +1 206-854-5027
    yvonne.l.leach@boeing.com
    Marc Birtel
    787 Communications
    +1 206-390-4115
    marc.r.birtel@boeing.com
    More Information: http://www.boeing.com/commercial/787family/index.html
    SOURCE: Boeing
    Web site: http://www.boeing.com/

  • | | | | |

    Gulf & Caribbean Air Loses Oil over Cincinnati


    Pictured: N281FL formerly known as C-GKFH Purolator Courier (Kelowna Flightcraft Air Charter) Boeing 727-225(F) in its former life
    Click to view full size photo at Airliners.net
    Contact photographer Frank Robitaille

    What: Gulf & Caribbean Air Boeing 727-200 en route from Memphis,TN to Hamilton, Ontario
    Where: Cincinnati
    When: Dec 13th 2009
    Who: 3 crew members
    Why: While en route, engine 3 developed an oil pressure problem, most likely due to a leak. The right engine (3) was shut down and the plane diverted to Cincinnati where it made a safe landing.

    After landing, apparently maintenance discovered no oil IN the engine, but quite a lot ON it. Not finding a current photo of this plane in Gulf & Caribbean Air colors, we have delved into history and (if we have made no errors) resurrected a photo of this plane in its former life with the photographer’s permission. If there’s a mistake, it’s ours.

  • | | |

    Ethiopian Airlines: Aborts Takeoff


    PicturedL An Ethiopian Airlines Boeing 767-3BG/ER
    Click to view full size photo at Airliners.net
    Contact photographer Tommy Desmet

    What: Ethiopian Airlines Boeing 767-300 en route from Nairobi to Addis Ababa
    Where: Nairobi
    When: Dec 11th 2009
    Who: not available
    Why: The flight aborted takeoff and was rescheduled 4 hours later, when it successfully departed Nairobi.
    Details are not available.

  • | | | | | |

    Condor Engine Stall


    Click to view full size photo at Airliners.net
    Contact photographer Ralf Meyermann

    What: Condor Boeing 757-300 en route from Tenerife Sur Reina,CI Spain to Dusseldorf Germany
    Where: Las Palmas
    When: Dec 13th 2009
    Who: not available
    Why: While en route, an engine stalled. The plane diverted to Las Palmas, where a replacement plane was sent.

    The plane landed safely in Las Palmas, and the replacement plane delivered the passengers safely 9 hours later.

  • | | | |

    Nigeria: ATC Down


    Pictured: An Ethiopian Airlines Boeing 767-3BG/ER
    Click to view full size photo at Airliners.net
    Contact photographer Pieter-Jan Van De Vijver

    What: Ethiopian Airlines Boeing 767-300 en route from Addis Ababa to Lagos
    Where: Lagos Nigeria
    When: Dec 13th 2009
    Who: 180 passengers
    Why: On approach, ATC communication failed. With air traffic control’s radar and communication radio out of service, the flight circled, and after two hours in a holding pattern, landed after declaring a fuel emergency.

    Other flights also had the same experience.

    Nigeria’s Airspace Management Agency NAMA was unavailable for two hours.

  • | | |

    Sumatra: Lion Air Skid


    Pictured: Lion Airlines Boeing 737-46B
    Click to view full size photo at Airliners.net
    Contact photographer JKSC

    What: Lion Air Boeing 737-400
    Where: Pekanbaru airport, Sumatra
    When: December 14, 2009
    Who: 165 passengers
    Why: On landing, the flight skidded off the runway. It took an hour to evacuate the panicked passengers via mobile stairway.

    After a maintenance check, a replacement crew resumed the flight hours later.

  • |

    Boeing Press Release: Boeing Completes 787 Dreamliner High-Speed Taxi Test

    EVERETT, Wash., Dec. 12 — Boeing (NYSE: BA) completed high-speed taxi tests on the first 787 Dreamliner today. This is the last in a series of functional tests planned in preparation for first flight.

    “Our pilots told me the airplane performed beautifully,” said Mike Delaney, vice president and chief project engineer for the 787. “We’re going through and analyzing the data to ensure we’re ready for first flight. From evaluations we’ve done so far, everything looks good.”

    During the testing, the airplane reached a top speed of approximately 130 knots (150 mph, 240 kph), and the pilots lifted the nose gear from the pavement. Video highlights of the taxi testing will be available by the end of the day Monday at www.boeing.com and www.newairplane.com.

    Taxi test is the last testing planned before first flight.

  • | | | |

    Empresa Emergency Landing in Santo Domingo


    Click to view full size photo at Airliners.net
    Contact photographer Ricardo Morales

    What: Empresa Aerocaribbean SA Boeing 737-200 en route from Caracas Venezuela to Santiago Cuba
    Where: Santo Domingo
    When: Dec 10th 2009
    Who: 90 passengers and 9 crew
    Why: While en route, the flight developed oil filter trouble in the right engine.

    Gushing black smoke, the plane made an emergency landing in Santo Domingo where maintenance took care of the problem. In six hours, passengers continued to their destination on the same plane.

  • | | | |

    Air France hydraulics failure at Sao Paulo


    Click to view full size photo at Airliners.net
    Contact photographer Sergey Kustov

    What: Air France Boeing 777-200 en route from Paris France to Sao Paulo
    Where: Sao Paulo
    When: Dec 9th 2009
    Who: 259 passengers and 16 crew
    Why: While on approach to Sao Paulo, the plane experienced a hydraulics failure. The crew requested the longest available runway and made a safe landing.

    Passengers debarked normally.

    George’s Point of View

    Maintenance is so important.

  • | | | |

    Condor Gear Door Error Interrupts Nassau Flight


    Click to view full size photo at Airliners.net
    Contact photographer Terence Li

    What: Condor Boeing 767-300 en route from Punta Cana Dominican Republic to Frankfurt/Main
    Where: Punta Cana
    When: Dec 7th 2009
    Who: not available
    Why: After takeoff from Punta Cana, the gear did not retract. When the crew received a “disagreeing gear doors” alert, they returned to the airport and made a safe landing about 2 and a half hours later.

  • | | | | |

    BA Boeing Emergency Goes Up in Smoke on Nassau Flight


    Click to view full size photo at Airliners.net
    Contact photographer Alevik

    What: British Airways Boeing 767-300 en route from London to Nassau Bahamas
    Where: Gander Canada
    When: Dec 8th 2009
    Who: 147 passengers
    Why: While over the atlantic, crew detected the smell of smoke in the cabin. The flight diverted to Gander, where it was examined for 3.5 hours, and no traces or problems reported. Passengers continued on the same plane to Nassau.

  • | | |

    NTSB Investigating October Turbulence Incident


    Click to view full size photo at Airliners.net
    Contact photographer Cary Liao
    The incident 35,000 feet above Norfolk where an AirTran Airways Boeing 717 maneuvered to avoid another aircraft on Oct. 26, and a passenger and flight attendant were both injured by turbulence is currently being investigated by the NTSB.

    The FAA does not know if the sharp loss of altitude is related to the collision avoidance maneuver or turbulence. The incident is not being called a close call.

    Original Incident post

  • |

    Press Release: Boeing’s Houston Site Achieves Additional Environmental Certification

    HOUSTON, Dec. 7, 2009 — The Boeing Company [NYSE: BA] today announced that its Houston site recently received Leadership in Energy and Environmental Design (LEED) Gold certification, the latest official recognition of the site’s efforts to improve its environmental performance. The U.S. Green Building Council’s LEED certification system is the foremost program for the design, construction and operation of green buildings. The certification process reviews energy, lighting, water and material use, and a variety of other sustainable strategies.

    The LEED Gold certification was awarded to the Houston facility’s Bay Area Boulevard building in September in the category of “existing buildings.” The site also earned International Organization for Standardization (ISO) 14001 certification in September and an ENERGY STAR rating for the Bay Area Boulevard building in December 2008. The Bay Area Boulevard building is a 399,000-square-foot facility surrounded by wildlife at the border of metropolitan Houston and the wetlands of the Texas Gulf Coast. Houston is the first Boeing site to carry all three environmental certifications and one of only seven Houston-area companies to have a LEED Gold-certified existing building.

    “These certifications lay the foundation for continually improving our site’s environmental performance for reducing pollution and waste, increasing recycling rates and improving energy efficiency,” said Brewster Shaw, vice president and general manager for Boeing Space Exploration. “Most importantly, they ensure our communities and our customers know that we’re doing our part to protect the environment.”

    By retrofitting the Houston site’s heating and cooling system and installing more efficient lighting and automated controls, Boeing has reduced energy consumption by more than 2 million kilowatt hours annually, or enough electricity to power about 170 average homes. The new heating and cooling system has saved the site $250,000 per year in energy costs since it was installed in 2007. The energy-efficient lighting system controls the building’s lighting automatically, based on peak employee occupancy hours. During off-peak hours, employees can call an automated number to have the lights turned on in their designated work area.

    The 21-acre site has more than 2,500 employees and serves as the headquarters for Boeing’s Space Exploration division, which includes the Constellation, International Space Station and Space Shuttle programs.

    The ISO 14001 environmental management system is a global standard — a common approach — to continually improve an organization’s environmental goals for reducing pollution and waste, increasing recycling rates and improving energy efficiency.
    ENERGY STAR — jointly sponsored by the U.S. Environmental Protection Agency and the U.S. Department of Energy — is dedicated to helping businesses and homeowners save money and protect the environment through energy-efficient products and practices. ENERGY STAR offers a proven energy-management strategy for companies by helping them measure current energy performance, set goals, track savings and reward improvements.

    A unit of The Boeing Company, Boeing Integrated Defense Systems is one of the world’s largest space and defense businesses specializing in innovative and capabilities-driven customer solutions, and the world’s largest and most versatile manufacturer of military aircraft. Headquartered in St. Louis, Boeing Integrated Defense Systems is a $32 billion business with 70,000 employees worldwide.

    # # #
    Contact:
    Adam Morgan
    Boeing Space Exploration
    281-386-4396
    adam.k.morgan@boeing.com
    Ed Memi
    Boeing Space Exploration
    713-204-5464
    edmund.g.memi@boeing.com