|

NTSB Investigating Engine Failure

Similar Posts

  • Press Release: NTSB Opens Docket on Reno Air Race Crash


    AUGUST 21, 2012
    WASHINGTON – As part of its continuing investigation into the September 2011 crash of a highly modified P-51D airplane at the National Championship Air Races in Reno, Nevada, the National Transportation Safety Board has opened the public docket.

    On September 16, 2011, the pilot of the Galloping Ghost experienced an upset while turning between pylons 8 and 9 on the race course. The airplane crashed on the ramp in the box seat spectator area. The pilot and 10 spectators were killed and more than 60 others were injured.

    The information being released today is factual in nature and does not provide any analysis. Included in the docket are photographs, a video, 47 documents and more than 900 pages, including interview summaries, maintenance records and other documents.

    Additional material may be added to the docket as it becomes available. Analysis of the accident, along with a determination of probable cause, will come later this month when the final report on the investigation is completed.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • |

    Former MD, NTSB Criticizes Malaysia’s Handling of Airplane Disappearance Crisis

    According to Peter Goelz ,former managing director of the United States National Transportation Safety Board (NTSB), Malaysia has not abided by the protocols of the Convention on International Air Transportation, in handling the Malaysia Airlines’ (MAS) MH370 disappearance crisis.

    In a recent interview, he regarded Malaysia’s conduct in this case as ‘the worst he has ever seen’.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | | |

    NTSB PROVIDES UPDATE ON BOEING 787 BATTERY FIRE INVESTIGATION



    WASHINGTON – The investigative work into the Jan. 7, 2013, fire aboard a Japan Airlines Boeing 787 at Logan International Airport in Boston, is estimated to be completed by the end of March, the National Transportation Safety Board said today. The analytical and report writing phase of the investigation will follow the completion of the investigative activities. The final report is expected to be presented to the Board at a public meeting in Washington in the fall.

    Members of the investigative team have been conducting work in the United States, Japan, France, and Taiwan. As the investigation has progressed, the NTSB has been working closely with Boeing, the Federal Aviation Administration, the Japan Transport Safety Bureau, the French BEA, and technical advisors from Japan and France.

    Some of the investigative activities include:

    – Completed disassembly and documentation of the individual cells of the incident battery.

    – Completed examinations of exemplar batteries and battery cells for baseline reference and comparison to the incident battery. These examinations were conducted at NTSB and independent laboratories and included computed tomography scans, non-destructive soft short testing, and destructive evaluation and analysis of the batteries and cells.

    – Awarded a contract to Underwriter’s Laboratories to assist the NTSB in defining and performing system-level tests of the Boeing 787 battery and charging system. The testing includes characterization of the thermal and electrochemical properties of the battery and oscillatory testing and is expected to be completed in February.

    – Radiographic studies, which included over 200,000 CT scan images, were conducted to examine and document the internal configuration of individual cells from the incident and exemplar batteries.

    – Conducted interviews with FAA, Boeing, Thales, and GS Yuasa personnel to review and document key steps, personnel roles and responsibilities, data and information flow, design artifacts, and approvals in the certification process for the battery and charging system.

    – Evaluated and documented the process for the battery system safety assessment, including a review of the supporting tests and analysis performed and the safety analysis standards relevant for lithium-ion batteries.

    – Conducted on-site survey of battery manufacturing facility in Japan including a review of design, engineering, and production documentation, as well as manufacturing processes, procedures, and training for personnel involved in the manufacture of the battery.

    The date of the Board meeting at which the findings of the investigation will be released, including the probable cause of the battery fire, will be announced later in the year.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | | | |

    NTSB to Hold Investigative Hearing Into August 2013 UPS A300 crash in Birmingham, Ala.


    NTSB to Hold Investigative Hearing Into August 2013 UPS A300 crash in Birmingham, Ala.

    Jan. 30, 2014
    WASHINGTON – The National Transportation Safety Board has scheduled an investigative hearing on February 20 into the crash of a UPS Airbus A300-600 on approach to Birmingham-Shuttlesworth International Airport in Birmingham, Ala., on Aug. 14, 2013.
    The two flight crew members were killed and the airplane was destroyed when it impacted the ground less than a mile short of Runway 18. The cargo flight had originated from Louisville, Ky. Runway 18 was being used because the main runway at the airport was closed for repairs at the time of the airplane’s arrival.
    The one-day hearing will examine:
    • Execution of non-precision approaches, including initial and recurrent training, adherence to standard operating procedures, and proficiency
    • Human factors issues associated with effective crew coordination and resource management applicable to this accident, including decision-making, communication, fatigue and fitness for duty, as well as monitoring and cross-checking, policies, standard operating procedures, guidance, and training provided to UPS crewmembers.
    • Dispatch procedures, including the training, evaluation, roles and responsibilities of UPS dispatchers and the limitations of dispatch-related software.
    The investigation is ongoing and this hearing will develop additional facts to support the investigation. The hearing will be held in the NTSB Board Room and Conference Center in Washington, D.C. A detailed agenda and a list of attendees will be forthcoming.
    Parties to the hearing will include the Federal Aviation Administration, UPS, Airbus, the Independent Pilots Association and the Transport Workers Union. The accredited representative from the French Bureau d’Enquêtes et d’Analyses pour la sécurité de l’aviation civile (BEA) will participate on the technical panels.
    The determination of the probable cause of the crash will be released when the investigation is complete. Just prior to the start of the hearing, the public docket will be opened. Included in the docket are photographs, interview transcripts and other documents.

    To include the featured image in your Twitter Card, please tap or click their icon a second time.
  • | | |

    NTSB Directive Contradicts Boeing Statement

    On April 25, the NTSB released information about the April 1 Southwest Airlines Boeing 737-300 fuselage incident where the rupture in the fuselage caused depressurization and forced pilots to make an emergency landing in Yuma.

    From the release

    The NTSB Materials Laboratory work is actively conducting additional inspections and examinations in the following areas:

    1. Removal of rivets and examination of rivet hole dimensions, rivet dimensions, and rivet hole alignment between upper and lower skins.
    2. Detailed fractographic analysis of the skin fractures emanating from the rivet holes using optical and scanning electron microscopes.
    3. Fatigue striation analysis using a scanning electron microscope of specific skin fractures to determine the rate of crack propagation.
    4. Additional portions of the lap joints from the accident aircraft.

    Of 136 airplanes inspected worldwide four had crack indications at a single rivet and one plane was found to have crack indications at two rivets.

    In spite of these findings, Boeing Chief Executive Jim McNerney told Reuters“I think the initial data that I think we’re all seeing is suggesting a possible workmanship issue on an airplane, rather than a design issue across a fleet of airplanes.”

    If Boeing believes that the problem was workmanship on a single plane, then how did other planes reveal conditions precursing the same type of rupture incident as was incurred on Southwest Airlines Flight 812?

    To include the featured image in your Twitter Card, please tap or click their icon a second time.